Time Management of Construction Machinery Using the FMEA Method

##plugins.themes.academic_pro.article.main##

Hamidreza Hoseynimanesh1, Ramin Tabatabaei Mirhosseini2,*, Mehdi Momeni Rogh Abadi3

Abstract

FMEA techniques is one of the most common and the most effective method of failure modes and effects analysis. This technique has many benefits that they offer perhaps the most systematic and dynamic approach to identify and prioritize the failure modes based on a few factors. Despite all its advantages, this technique has disadvantages in practice. Therefore, it is essential that in this article, the analysis of these features to manage machines is discussed and presented suggestions to improve it. In this article, the proposed method based on the FMEA is provided and prioritize the problems of management of machines, resulting in increased time and cost of the project is to solve and prioritize repairs based on calculations jump a method strong more and more logical to lose. Since in this situation of absolute failure, and the relative, between modes of failure of the evaluation will be possible to estimate the costs and other factors required in the management discussion more easily be possible. Based on the chart to prioritize management machinery parts on the basis of FMEA can be seen that the following as the most important priority of trying to manage machines for hot and cold too, loosening and strengthening and increasing or decreasing the pressure recommended.


 


Keywords: Time management, Machinery, FMEA, Construction projects


 


 

##plugins.themes.academic_pro.article.details##

How to Cite
Hamidreza Hoseynimanesh1, Ramin Tabatabaei Mirhosseini2,*, Mehdi Momeni Rogh Abadi3. (2024). Time Management of Construction Machinery Using the FMEA Method. International Invention of Scientific Journal, 8(03), Page: 279–287. Retrieved from https://iisj.in/index.php/iisj/article/view/454